Connect JobTread so Subtrak can supply to-dos, match assignees, and offer project templates for jobs while your processes remain managed in Subtrak.

Before you begin: Use Administrator access in Subtrak, an eligible Pro company, and permission to create a grant for your JobTread organization.

Create a JobTread grant

  1. In JobTread, open Profile > Grants.

  2. Under the organization you want to connect, choose + Grant.

  3. Name the grant Subtrak and copy the grant key.

Connect the organization

  1. In Subtrak, open Settings > JobTread.

  2. Paste the key into Grant key and choose Continue.

  3. Choose the JobTread organization the connection should use.

  4. Choose Connect.

Choose what syncs

Review the switches under What syncs and enable the features you need.

  • Project and operation tasks: send supported tasks as JobTread to-dos and keep completion status in sync.

  • Team members: match people by email so task assignees can carry over.

  • Project templates: make Subtrak templates available when starting a job in JobTread.

The connection and its feature switches are separate. Review these settings after connecting rather than assuming all features are enabled.

Link work and check assignments

For an existing Subtrak project, use its Link JobTread job action to choose the corresponding open job. Review the job name and confirm the link.

Use Review matches in Team to check member matching. Correct mismatched or missing email addresses before relying on assignments. Check the connection's sync status and use Sync now when offered.

Understand completion and template limits

Supported completion status can sync in both directions. Tasks that require evidence or follow decision branches may need additional action in Subtrak; do not assume a JobTread checkbox supplies required proof or a decision answer.

Copying an individual process as a JobTread to-do template is a separate action from enabling project-template syncing. A one-time template copy is not kept synchronized with later changes on either side.

Replace a key or stop syncing

Use the connection's menu to Replace grant key when needed. The replacement must access the same organization.

To stop an existing project's link, use Unlink JobTread job. Existing to-dos stay in JobTread while new changes from that project stop syncing. To remove the company connection, use its disconnect action and review the confirmation.